§ 98-257. Certified plat required.  


Latest version.
  • The owner of an intensive facility constructed or completed after the effective date of the ordinance from which this section is derived shall file with the zoning administrator a plat or similar documentation showing the entire parcels on which the facility is located and also showing the locations of the existing or proposed facilities within the parcels. This plat shall also show the location of any existing dwellings or structures, watercourses, ponds, streams or Chesapeake Bay Resource Protection Areas. With this plat or similar documentation, the owner shall submit a written statement, sworn to and subscribed before a notary public, by which the owner certifies to the zoning administrator that the intensive facility shown on the plat or similar documentation meets all applicable setback requirements of this article.

    (Code 1999, § 9-89.5)

(Code 1999, § 9-89.5)