Appendix A. FEES  


Latest version.
  • AIRPORT

    Item Base Fee
    Closed T-Hangar fee, per month $145.00
    Open T-Hangar fee, per month 135.00
    Corporate hangar #18 fee, per month 260.00
    Corporate hangar #19 fee, per month 175.00
    Space rental—Main terminal hanger, per month 200.00
    Hangars A-1 to A-5, per month 250.00
    Hangar A-6, per month 310.00
    Hangars A-7 to A-10, per month 250.00
    Row A hangars split two tenants (excluding A-6), per month 150.00
    After hours recovery fee, per hour 50.00
    Apron tie-downs, per month 50.00
    Daily aircraft staging fee 35.00 (new)

     

    ANIMAL CONTROL

    Item Base Fee
    Dog license $6.00
    Kennels less than 20 animals 25.00
    Kennels less than 50 animals 35.00
    Duplicate dog license 1.00
    Impoundment of dog 20.00
    Plus, per day 8.00
    Control of dangerous dog 50.00

     

    BUILDING DEVELOPMENT PERMIT FEES

    Item Base Fee
    Commercial building and all sub permits:
    Job cost (labor and materials) $0.00—$500.00 $65.00
    Job cost (labor and materials) $501.00—$1,000.00 69.50
    Job cost (labor and materials) $1,001.00—$2,000.00 76.00
    Job cost (labor and materials) $2,001.00—$3,000.00 81.50
    Job cost (labor and materials) $3,001.00—$4,000.00 87.00
    Job cost (labor and materials) over $4,001.00 92.50
    Plus, $1,000.00 or fraction thereof over $5,000.00 6.00
    Missed inspection fee 55.00
    Residential building permits: Estimated market value per $1,000.00 or fraction thereof 2.00
    Minimum building permit fee 65.00
    Moving building permit, per square foot of foundation 0.25
    Building demolition permit 70.00
    Manufactured home installation permit (per unit) 100.00
    Illuminated sign permit 70.00
    Renewal of building permit 40.00
    Miscellaneous structures permit, per $1,000.00 of fair market value 2.00
    Zoning verification fee collected with
    building permit application
    30.00
    Administrative fee (non-refundable) (fee or 25%
    of permit fee, whichever is greater)
    30.00
    Appeal to building code board 250.00
    Outsourced plan review and inspection fee Invoice customer
    Plan amendment application 40.00
    Plan amendment with new plan review 100.00
    Change of contractor/mechanic's lien agent 40.00
    Re-inspection fee 55.00
    Amusement device rides:
    Kiddie ride 35.00
    Circular/flat rides 55.00
    Spectacular rides 75.00
    Coasters over 30ft. in height 200.00
    Generators for amusement event 165.00
    Temporary Certificate of Occupancy—Residential 60.00
    Temporary Certificate of Occupancy—Commercial 120.00

     

    COURTS

    Item Base Fee
    Courthouse maintenance fee (collected in criminal, traffic and civil cases filed in district and circuit courts $2.00
    Courthouse security fee (collected in criminal and traffic convictions in district and circuit courts) 10.00

     

    CULTURAL EVENT/PROGRAM

    Item Base Fee
    Permit for cultural events and programs $600.00
    Fee for additional event in same calendar year 300.00

     

    ENVIRONMENTAL

    Item Base Fee
    Re-Inspection Fee $55.00

     

    LAND DEVELOPMENT

    Item FY15
    Adopted Fee
    FY16
    Proposed
    Base Fee
    Plus Per
    Lot/Acre
    Fee
    Erosion and sediment control plan review and inspection fee; Single Family for one acre or less $75.00 $75.00 $10.00 per acre
    Erosion and sediment control plan review and inspection fee; Commercial, Mixed Use, or Industrial $100.00 $100.00 $50.00 per acre
    Land Disturbance Permit - Single Family $210.00 $210.00 $20.00 per acre
    Land Disturbance Permit Renewal Fee - all Single Family $35.00 $50.00
    Land Disturbance Permit - Commercial, Mixed Use, or Industrial $465.00 $465.00 $50.00 per acre
    Land Disturbance Permit Renewal Fee - Commercial, Mixed Use, or Industrial $35.00 $150.00
    Erosion and sediment control - Environmental Violation $100.00 $100.00
    Environmental Restoration Fee (SFD) $25.00 $25.00
    RPA Modification Permit $95.00 $95.00
    Wetlands development/CBPA application fee (when public hearing required) $625.00 $625.00
    CBPA Exception Permit $250.00 $250.00
    RPA Signs $7.50 per sign $10.00 per sign

     

    MOTOR VEHICLES

    Item Base Fee
    Annual license registration fee for motor vehicle $25.00
    Annual license registration fee for Virginia National Guard is one-half of applicable registration fee 12.50
    Annual license registration fee for volunteer firefighters, rescue squad and auxiliary deputies is waived 0.00
    Annual license registration fee for tractor and trailer, each 15.00
    Annual license registration fee for trailer 15.00
    Annual license registration fee for motorcycle 15.00
    Annual license registration fee for two-wheeled trailer 6.50
    Annual license registration fee for farm vehicle 15.00

     

    PARKS & RECREATION FACILITY RENTAL

    Item Base Fee
    Athletic fields $10 per hour
    (minimum 2 hours)
    Field lights $30 per hour
    (in addition to field rental)
    Field preparation $75 per field
    Classrooms $10 per hour
    (minimum 2 hours)
    Gyms $30 per hour
    ($200 maximum per day)
    Quinton Community Center $50 per hour
    ($300 maximum per day)
    Quinton Community Park Pavilion $25 per half day (4 hours)
    or $50 per full day
    Wahrani Nature Trail Pavilion $25 half day (4 hours)
    or $50 full day
    Rental fees may be waived for the following groups only:
    1. Any New Kent County agency, or group affiliated with those agencies.
    2. All school division groups and school sponsored activities, acting in an official capacity.
    3. Specific events run by local charitable organizations (must have 501c3 status) if held between 4:00—8:00 p.m. Monday-Friday during the school year, or between 7:00 a.m.—5:00 p.m., Monday—Thursday during school summer break.

     

    PAWN SHOPS

    Item Base Fee
    Application for pawn shop permit $200.00
    Renewal fee for pawn shop permit 200.00

     

    PRECIOUS METALS AND GEMS

    Item Base Fee
    Application for gem and precious metals dealer permit $200.00
    Renewal fee for gem and precious metals dealer permit 200.00

     

    PUBLIC-PRIVATE EDUCATION ACT

    Item Base Fee
    Unsolicited proposals:
    Initial nonrefundable review fee 0.5% of project value,
    not to exceed $5,000.00
    Review fee (includes competing proposals) 1% of project value,
    not to exceed $50,000.00
    Solicited proposals:
    Review fee 0.5% of project value
    not to exceed $50,000.00

     

    PUBLIC SAFETY—FIRE DEPARTMENT

    Item Current
    FY20
    Base Fee
    Proposed
    FY21
    Base Fee
    Burn Permit - Commercial Process Open Air Fire Permit Annual $0.00 $950.00
    Burn Permit - Commercial Non-Process Open Air Fire Permit Annual - Offsite brush, logs, stumps and other vegetative matter. $0.00 $1,250.00
    Cost Recovery for Emergency Response:
    Engine Company $85.00/hr. $125.00/hr.
    Tanker Company $60.00/hr. $100.00/hr.
    Brush Truck $50.00/hr. $70.00/hr.
    Ambulance $55.00/hr. $95.00/hr.
    Cost Recovery for Emergency Medical Services:
    Advanced Life Support 1 $660.00 $700.00
    Per mile charge for transport to hospital $9.50 $10.00
    Private Event Request: (Minimum 4 hour)
    Fire-Rescue Personnel 0.00 $40.00/hr.
    Fire Marshal's Office Personnel 0.00 $40.00/hr.
    Emergency Management Personnel 0.00 $40.00/hr.

     

    Fireworks Display and Special Effect Permit
    (Per event or location)
    Application received more than 15 days prior to event Additional fee for each consecutive day Application received less than 15 days prior but more than 7 days prior to event Additional fee for each consecutive day Application received less than 7 days prior to event Additional fee for each consecutive day
    Aerial
    Fireworks
    $250.00 $150.00 $550.00 $150.00 $650.00 $150.00
    Proximity Pyro $350.00 $150.00 $550.00 $150.00 $650.00 $150.00
    Flame w/ Pyro* $150.00 $125.00 $200.00 $100.00 $300.00 $125.00
    Flame effect w/o Pyro $300.00 $200.00 $550.00 $200.00 $650.00 $150.00

     

    *Fee is in addition to the fee levied for either aerial fireworks or close proximity pyrotechnics.

    PUBLIC UTILITIES

    Miscellaneous Fees
    Service Description FY21 Fee
    Plan review fees: Per linear foot of main line pipe $0.50
    GIS as-built fees, per linear foot of installed pipe $1.00
    Domestic Meter Installation
    Size of meter
    1" $400.00
    1½" $1,125.00
    2" $1,300.00
    Water Volume Fees (Including Irrigation)
    Minimum Usage FY21
    Base Fee
    0—6,000 Gallons
    ⅝" and ¾" meter minimum usage charge $48.09
    1" meter minimum usage charge $89.92
    1½" meter minimum usage charge $189.51
    2" meter minimum usage charge $284.78
    3" meter minimum usage charge $496.79
    4" meter minimum usage charge $795.50
    6" meter minimum usage charge $1,589.91
    8"—10" meter minimum usage charge $2,842.00
    Number of billings per year: 6
    Number of gallons for minimum usage charge 6,000 or less
    Plus charges per 1,000 gallons over minimum usage for total water consumption (domestic and irrigation):
    Usage 6,001—12,000 gallons $7.22
    Usage 12,001—18,000 gallons $7.87
    Usage 18,001 + gallons $8.25
    Water Connection Charges
    Size of Meter FY21 Fee
    Connection Charges:
    Irrigation meter—Construction and installation $1,000.00
    Sewer Volume Fees
    Minimum Usage FY21
    Base Fee
    0—6,000 Gallons
    ⅝" and ¾" meter minimum usage charge $66.82
    1" meter minimum usage charge $157.38
    1½" meter minimum usage charge $307.27
    2" meter minimum usage charge $532.12
    3" meter minimum usage charge $1,064.20
    4" meter minimum usage charge $1,729.50
    6" meter minimum usage charge $3,540.61
    8"—10" meter minimum usage charge $7,258.96
    Number of billings per year: 6
    Number of gallons for minimum usage charge 6,000 or Less
    Plus charge per 1,000 gallons over minimum usage for all size meters:
    Usage 6,001—12,000 gallons $10.01
    Usage 12,001—18,000 gallons $10.85
    Usage 18,001 + gallons 11.43

     

    REFUSE AND RECYCLING

    Item FY 21 Fee
    Freon appliance disposal, per unit 10.00

     

    STORMWATER

    Item Fees for Permit Issuance Fees for the Modification, Transfer or Registration Statements for General Permit for Discharges of Stormwater from Construction Activities Permit
    Maintenance
    Fees
    Chesapeake Bay Preservation Act Land-Disturbing Activity (not subject to General Permit coverage; within designated areas of Chesapeake Bay Act localities with land-disturbance acreage equal to or greater than 2,500 square feet and less than 1 acre) $290.00 n/a $50.00
    General/Stormwater Management - Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land disturbance acreage of less than 1 acre) $290.00 $20.00 $50.00
    General/Stormwater Management - Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land disturbance acreage equal to or greater than 1 acre and less than 5 acres) $2,700.00 $200.00 $400.00
    General/Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land disturbance acreage equal to or greater than 5 acres and less than 10 acres) $3,400.00 $250.00 $500.00
    General/Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land disturbance acreage equal to or greater than 10 acres and less than 50 acres) $4,500.00 $300.00 $650.00
    General/Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land disturbance acreage equal to or greater than 50 acres and less than 100 acres) $6,100.00 $450.00 $900.00
    General/Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land disturbance acreage equal to or greater than 100 acres) $9,600.00 $700.00 $1,400.00

     

    (a)

    Fees to cover costs associated with implementation of a VSMP related to land-disturbing activities and issuance of general permit coverage and VSMP authority permits shall be imposed in accordance with the fees set out in the fee schedule entitled "Fees for Permit Issuance." When a site or sites has been purchased for development within a previously permitted common plan of development or sale, the Applicant shall be subject to fees in accordance with the disturbed acreage of their site or sites as listed in the "Fees for Permit Issuance" table.

    (b)

    Fees for the modification or transfer of registration statements from the general permit issued by the state board shall be imposed in accordance with the table entitled "Fees for the Modification or Transfer of Registration Statements for the General Permit for Discharges of Stormwater from Construction Activities." If the general permit modifications result in changes to stormwater management plans that require additional review by the County of New Kent, such reviews shall be subject to the fees set out in the table referenced in this paragraph. The fee assessed shall be based on the total disturbed acreage of the site. In addition to the general permit modification fee, modifications resulting in an increase in total disturbed acreage shall pay the difference in the initial permit fee paid and the permit fee that would have applied for the total disturbed acreage in the table entitled "Fees for Permit Issuance."

    (c)

    The annual permit maintenance shall be imposed in accordance with the table entitled "Permit Maintenance Fees," including fees imposed on expired permits that have been administratively continued. With respect to the general permit, these fees shall apply until the permit coverage is terminated.

    General permit coverage maintenance fees shall be paid annually to the County of New Kent, by the anniversary date of the general permit coverage. No permit will be reissued or automatically continued without payment of the required fee. General permit coverage maintenance fees shall be applied until a notice of termination is effective.

    (d)

    The fees set forth in subsections (a) through (c) above, shall apply to:

    1.

    All persons seeking coverage under the general permit.

    2.

    All permittees who request modifications to or transfers of their existing registration statement for coverage under a general permit.

    3.

    Persons whose coverage under the general permit has been revoked shall apply to the Department of an individual permit for discharges of stormwater from construction activities.

    4.

    Permit and permit coverage maintenance fees outlined in Appendix A "Fees" may apply to each general permit holder.

    (e)

    No general permit application fees will be assessed to:

    1.

    Permittees who request minor modifications to general permits as defined in section 82-01. Permit modifications at the request of the permittee resulting in changes to stormwater management plans that require additional review by the administrator shall not be exempt pursuant to this section.

    2.

    Permittees whose general permits are modified or amended at the initiative of the department, excluding errors in the registration statement identified by the administrator or errors related to the acreage of the site.

    (f)

    All incomplete payments will be deemed as non-payments, and the applicant shall be notified of any incomplete payments. Interest may be charged for late payments at the underpayment rate set forth in Code of Virginia § 58.1-15 and is calculated on a monthly basis at the applicable periodic rate. A ten percent late payment fee shall be charged to any delinquent (over 90 days past due) account. The County of New Kent shall be entitled to all remedies available under the Code of Virginia in collecting any past due amount.

    TAXATION

    Item Base Fee
    Administrative cost fee for collection of delinquent taxes is ten percent of tax due Fee is stated in
    Code § 66-32(d).
    Return check fee $25.00
    Administrative fee for DMV Stop issued for unpaid personal property taxes 25.00

     

    ZONING AND SUBDIVISION (Land Development)

    Item Base Fee Additional Lot/Acre Fee and Explanation
    Zoning opinion letter $150.00
    Public hearing deferral at applicant's request (fee per occurrence + cost of re-advertising) $350.00
    Conditional Use Permit $1,600.00 $40.00 per disturbed/use acre
    Conditional Use Permit Amendment $1,150.00
    Conditional Use Permit for Home Occupation $600.00
    Rezoning $1,600.00 $40.00 per acre
    Planned Unit Development (PUD) $2,200.00 $40.00 per acre
    PUD Area Plan $1,200.00
    PUD Amendment of Master Plan $1,200.00 $10.00 per acre
    Variance request to Board of Zoning Appeals (BZA) $750.00
    Zoning Administrative Modification $450.00
    Appeal of Zoning Administrative Modification decision to the BZA $600.00
    Site Plan $700.00 $25.00 per disturbed/use acre
    Site Plan —Amendment of approved $650.00 $25.00 per disturbed/use acre
    Site Plan—re-examination after second resubmission $325.00 $25.00 per disturbed/use acre
    Subdivision—preliminary $875.00 $20.00 per lot
    Subdivision—development/construction plan $875.00 $20.00 per lot
    Subdivision—final $875.00 $20.00 per lot
    Subdivision—re-examination after second resubmission $450.00 $25.00 per lot
    Subdivision—family $300.00 $10.00 per lot
    Subdivision—Boundary Line Adjustment or Lot Consolidation $150.00
    Map review and maintenance fee (for all Subdivisions) $35.00 $10.00 per lot or acre that is being adjusted (in the case of a Boundary Line Adjustment)
    Agricultural and forestal district application fee $50.00 Plus $0.25/acre, not to exceed $500.00

     

    (Ord. No. O-06-09, 5-11-2009; Ord. No. O-10-09, 7-13-2009; Ord. No. O-03-10, 6-14-2010; Ord. No. O-11-10, 12-13-2010; Ord. No. O-06-11, 5-25-2011; Ord. No. O-04-12, 5-30-2012; Ord. No. O-10-12, 9-10-2012; Ord. No. O-15-12, 11-14-2012; Ord. No. O-02-13, 5-29-2013; Ord. No. O-09-13, 8-12-2013; Ord. No. O-07-14(R), 5-28-2014; Ord. No. O-09-14, 6-23-2014; Ord. No. O-09-15, 5-20-2015; Ord. No. O-10-15, 5-20-2015; Ord. No. O-09-16, 5-25-2016; Ord. No. O-05-17, 4-26-2017; Ord. No. O-06-17, 4-26-2017; Ord. No. O-20-17, 7-6-2017; Ord. No. O-06-18, 5-23-2018; Ord. No. O-02-19, 4-24-2019; Ord. No. O-05-20, 5-27-2020)

    Editor's note— Ord. No. O-05-20, adopted May 27, 2020 shall be effective July 1, 2020.

    Footnotes:
    --- (1) ---

    Editor's note— Printed herein is the county's fee schedule, as adopted by Ordinance No. 0-09-00 on December 11, 2000, and effective on January 1, 2001. Amendments to the fee schedule are indicated by parenthetical history notes.  Ord. No. O-06-09 amended App. A in its entirety, in effect repealing and reenacting said appendix to read as herein set out. The former App. A pertained to similar subject matter and derived from Ord. No. O-08-03, May 27, 2003; Ord. No. O-04-04, April 13, 2004; Ord. No. O-09-04, June 1, 2004; Ord. No. O-10-04, July 1, 2004; Ord. No. O-21-04, Nov. 1, 2004; Ord. No. O-25-04, Dec. 13, 2004; Ord. No. O-24-04, Feb. 14, 2005; Ord. No. O-18-05, May 23, 2005; Ord. No. R-26-05, May 23, 2005; Ord. No. O-27-05, Nov. 1, 2005; Ord. No. O-01-06, Feb. 13, 2006; Ord. No. O-06-06, May 11, 2006; Ord. No. O-15-06, Jan. 8, 2007; Ord. No. O-08-07, May 29, 2007; Ord. No. O-10-07, May 29, 2007; Ord. No. O-19-07, Sept. 10, 2007; and Ord. No. O-07-08, June 9, 2008.